Sewer Pump Station General Worker x6
Sewer Pump Station General Worker x6 (6 Months Fixed Term Contract)
(RAN241009-3) – Rand Water
Ending Date: 2024/10/23
Reference Number: RAN241009-3
Job Title: Sewer Pump Station General Worker x6 (6 Months Fixed Term Contract)
Portfolio: Bulk Water Services – Operations
Job Type Classification: Contract
Place: Gauteng
Job Advert Summary
Cleaning of the Sewer Pump Stations and the Wastewater Treatment and Works including the maintenance of the garden. Reporting problems to the Supervisor.
Required Conditions:
•Grade 12 or Equivalent
•Previous Sewer Pump Station experience
•Physically fit
Primary Duties:
•Signing of the Pump Station Register.
•Pump Station Weekly Inspection
•Sweep floors (if required) in each Pump Station Visit.
•Wash floors and Walls (if required) weekly.
•Dusting of the electrical Panels weekly
•Washing handrails weekly
•Remove all litter from site and dump in demarcated bins.
•Clean the Yard of Pump Stations (Doing of the garden e.g., cutting the grass) as and when required.
Knowledge
•Basic understanding of Sewer Pump Stations.
•Basic Hygiene
•Safety working procedures
Skills
•Communication skills (listening and verbal).
•Good housekeeping skills.
Attitude
•General safety conscious
•Good working relations
•Willing to work overtime and Assist shift